LIVE DEMO · Laravel 13 · PHP 8.4 · SQLite · no JavaScript framework Laravel 13 · PHP 8.4 · SQLite Built by Zohaib Ahmad →
M Mehran Distributors

Raise a purchase order

The screen opens on what is actually short rather than on a blank form, because that is the list a buyer is working from. The expected date comes from the supplier's own lead time, so the “late” column elsewhere means the same thing every time.

Supplier

At or below reorder level

These are the lines the system would flag to a buyer this morning.

ProductCategory In stockReorder at Unit costOrder
Cable 2-core 10mm
CBL-2C-10
Cables 86 300 PKR 275
Coupler 6"
CPL-6
Fittings 62 80 PKR 410
Gate Valve 2"
GV-2
Valves 9 15 PKR 1,850
PVC Pipe 2" x 20ft
PVC-2-20
Pipes 22 30 PKR 1,180
Tee 4"
TEE-4
Fittings 54 60 PKR 290

The suggested quantity brings the line back to twice its reorder level. Change it, or set it to zero to leave the line out.

Anything else

ProductCategoryIn stockUnit costOrder
Cable 4-core 16mm
CBL-4C-16
Cables 1740 PKR 520
Coupler 4"
CPL-4
Fittings 335 PKR 240
Elbow 4" 90°
ELB-4-90
Fittings 196 PKR 265
PVC Pipe 4" x 20ft
PVC-4-20
Pipes 178 PKR 2,400
PVC Pipe 6" x 20ft
PVC-6-20
Pipes 104 PKR 3,850
Water Tank 1000L
TNK-1000
Tanks 11 PKR 18,500
Gate Valve 4"
GV-4
Valves 28 PKR 4,100

Cancel