LIVE DEMO · Laravel 13 · PHP 8.4 · SQLite · no JavaScript framework Laravel 13 · PHP 8.4 · SQLite Built by Zohaib Ahmad →
M Mehran Distributors

New order

The question this form answers most often is not what the dealer wants, it is whether they can have it. So the remaining credit is shown against every dealer before anything is chosen, and an order that would take them past the agreed limit is refused rather than queued for somebody to notice later.

Dealer

DealerCity OutstandingCredit limit Credit leftUsed
Rawalpindi PKR 89,540 PKR 180,000 PKR 90,460 50%
Gujar Khan PKR 66,420 PKR 120,000 PKR 53,580 55%
Rawalpindi PKR 44,250 PKR 400,000 PKR 355,750 11%
Islamabad PKR 26,400 PKR 250,000 PKR 223,600 11%
Taxila PKR 115,500 PKR 300,000 PKR 184,500 39%

Lines

Free is what is left after stock already promised to orders that have not been dispatched. It is the only figure a new order should ever be checked against — the quantity on the shelf is not available if somebody else has already been promised it.

ProductCategory In stockCommittedFree Unit priceQuantity
Cable 2-core 10mm
CBL-2C-10
Cables 86 60 26 PKR 365
Cable 4-core 16mm
CBL-4C-16
Cables 1740 0 1740 PKR 690
Coupler 4"
CPL-4
Fittings 335 120 215 PKR 330
Coupler 6"
CPL-6
Fittings 62 25 37 PKR 560
Elbow 4" 90°
ELB-4-90
Fittings 196 0 196 PKR 370
Tee 4"
TEE-4
Fittings 54 30 24 PKR 405
PVC Pipe 2" x 20ft
PVC-2-20
Pipes 22 18 4 PKR 1,490
PVC Pipe 4" x 20ft
PVC-4-20
Pipes 178 0 178 PKR 2,960
PVC Pipe 6" x 20ft
PVC-6-20
Pipes 104 0 104 PKR 4,620
Water Tank 1000L
TNK-1000
Tanks 11 4 7 PKR 23,400
Gate Valve 2"
GV-2
Valves 9 5 4 PKR 2,480
Gate Valve 4"
GV-4
Valves 28 6 22 PKR 5,350

Cancel

Placing an order does not move stock. Nothing leaves the warehouse until the order is dispatched, which is a separate step with its own check.